Project management of NTIS P1 Cybernetic Systems and Department of Cybernetics | WiKKY

Project

General

Profile

Matoušek Jindřich's activity

From 18.08.2017 to 16.09.2017

13.09.2017

19:00 HQSYN16 Task #4244 (Closed): Classifier spot checking
# Check various classifiers:
** linear
** non-linear
** ensemble
** MLP
# Select the best classifier (coarse gri...
Matoušek Jindřich
18:50 HQSYN16 Task #4242 (Closed): Context size for current GCI detection
Try various numbers of peaks around the current peak candidate Matoušek Jindřich
18:41 HQSYN16 Task #4241 (Closed): New acoustic features
* harmonic/noise
* voiced/unvoiced (V/U)
* F0 contour
Matoušek Jindřich
18:39 HQSYN16 Task #4240 (Closed): Implement GCI evaluation metrics
Done by Daniel Tihelka. Matoušek Jindřich
18:38 HQSYN16 Task #4240 (Closed): Implement GCI evaluation metrics
* Metrics:
** IDR
** missing rate
** false alarm rate
** accuracy (A25)
** IDA
** combined evaluation
* Python
Matoušek Jindřich
17:53 HQSYN16 Task #4239 (Closed): Baseline GCI detector
Published: "MATOUŠEK, J., TIHELKA, D. Classification-Based Detection of Glottal Closure Instants from Speech Signals"... Matoušek Jindřich
17:48 HQSYN16 Task #4239 (Closed): Baseline GCI detector
* based on standard classification techniques
* features inspired by (Barnard1991)
Matoušek Jindřich
17:53 HQSYN16 Task #4238 (Assigned): Classification-based GCI detection
Matoušek Jindřich
17:51 HQSYN16 Task #4238 (Closed): Classification-based GCI detection
Matoušek Jindřich
17:43 HQSYN16 Task #4238 (Closed): Classification-based GCI detection
_Parent task for classification-based glottal closure instant (GCI) detection_ Matoušek Jindřich
17:40 HQSYN16 Task #4237 (New): Continuity of F0 pattern
_Parent task for the continuity of the F0 pattern within the synthesized utterance_ Matoušek Jindřich
13:00 HQSYN16 Task #3690 (Closed): Annotation error detection
Matoušek Jindřich
 

Also available in: Atom